Description
Application Instructions
- To ensure the highest performance of the material, protection should be installed as soon as all surfaces to be covered are clean and are fully cured where necessary
- Material should be laid print side up, unless directed otherwise
- Unroll the material and cut to fit desired coverage area, pull protection taut to ensure that the material lies flat
- Smooth down all taped joints and perimeters by applying pressure along their length